
ABOUT THE PROJECT
CHALLENGES
High School
-
Inadequate air quality
-
Lacks adequate, secure, and controlled entrance
-
Lack of mass notifications and security alarm systems
-
Currently, there is not enough space to accommodate the number of students at lunch and to efficiently get them through the lunch line, causing some students to eat in other spaces such as their cars, or hallways, or not eat at all. According to DPI, the cafeteria is nearly 4,000 SF undersized.
-
Learning spaces are outdated and lack collaborative spaces to accommodate today’s learning programs
-
Pod structure does not create the most efficient and modern classroom space
-
Many interior finishes including flooring cabinetry, and fixtures are over 60 years old
-
Several spaces do not comply with ADA compliances
-
The heating system is past its life expectancy
Elementary Schools
-
Lack of adequate, secure, and controlled entrances
PROPOSED SOLUTION
-
Renovate the high school and build an addition to the high school
-
Classrooms
-
Cafeteria
-
Main Entrance
-
$35M in capital maintenance upgrades to include:
-
Roofing Repairs/Replacement
-
Fire Protection Systems
-
HVAC Replacement
-
Electrical Upgrades and Improvements
-
Intercom and Clock/Bell Systems
-
ADA Accommodations
-
Safety and Security
-
Enhance safety and security in the Elementary Schools
​
CONSTRUCTION UPDATES
PROJECT PLANS



RENDERINGS



